N Class 31874 Overhaul update – July 2015

 

image2_7

 

 

 

 

 

 

Since the last update, the N class team have made great progress with the overhaul. Volunteer numbers have reduced slightly recently but, hopefully, this is just due to the good weather and longer evenings.

There is an appeal at the end for help, as there are many ways in which you may be able to help the project. The main highlights of the work we have carried out are:

  • The frames are now 90% prepared & painted. Some areas, mainly between the frames, are now in gloss
  • The tender wheelsets are now finished in gloss. The driving wheelsets are progressing, with one set finished in gloss, and the other two in primer. Tyre measurements have been completed with all tyres found to be serviceable.
  • The overhauled cab has been trial fitted and adjusted. Only the original framework is being re-used, with all the sheeting being new material due to the old cab suffering serious corrosion. The cab has been disassembled for painting, which is now almost complete, prior to final assembly.
  • All brake rigging & frame hanger brackets have been fitted with new bushes, and new pins have been machined, hardened and ground to the correct diameter. All brake gear now is now in the process of being painted. The steam brake and vacuum brake cylinders are all in the process of being overhauled, with new pins and seals as required.
  • The overhauled reverser assembly and the reverser stand is now refitted to the cab, the reverser weigh shaft has been overhauled and fitted to frames and now the steam operated reverser clutch is in the process of being refitted.
  • New valve liners are in the process of being machined by Bryn Engineering, and they are due to come to Herston to fit them to the cylinders during July. The valve crossheads and slidebars have been overhauled, and the valve spindles have been machined. When the new valve liners are fitted, the original valve heads will be machined to suit the new valve liners. 
  • Other items being worked on include the buffers for both the loco and tender, the valve spindles and piston rods have both been machined and the new piston heads have been machined.
  • Progress on the boiler at Adam Dalgleish’s workshop includes the new inner backhead being formed and welded to existing inner firebox, whilst the new outer backhead and front tubeplate are in the process of being formed. The foundation ring has been repaired and bolted back in place to act as a jig for fitting the new backheads and side plates. Once the firebox is complete, the foundation ring will be riveted back in place.

image2_1image2_2

 

 

 

 

 

 

 

We are looking for more volunteers to help with the overhaul. This includes both physically on the overhaul itself and we are now also looking to form a fundraising team, not only to raise funds for the overhaul of 31874 but also towards the overhauls of 31625 and 31806 when the time comes. Full details of the fundraising team vacancies are available here: Fund raising support

If you would like to help with the fundraising, then don’t hesitate to contact Matt McManus by email matt.mcmanus@swanagerailway.co.uk

 

image2_1aimage2_4

 

 

 

 

 

 

 

The regular working party on 31874 is still every Wednesday evening from 16.30 until 21.00, but they are sometimes held on other days by prior arrangement.

If you think you may be able to provide physical help with the overhaul and would like to get involved then please contact Dan Bennett via email at dan.bennett@swanagerailway.co.uk

image2_3image2_5